TMCI PADOVAN Tunnel Warmer 9 m² Tunnel Pasteurizer (2023)

89,000 € (ExWorks)

Get an official quote
Country:Albania
Year:2023
Category:Tunnel Pasteurizer
Manufacturer:TMCI PADOVAN
Model:Tunnel Warmer 9 m²
Availability:Immediately
SKU:AL-TUN-TMC-2023-00001

Overview

Single-module tunnel warmer by TMCI Padovan (SAP-Blendtech), built in 2023 for filled beverage cans. The machine brings cold-filled cans from 5 °C to 25 °C with a 40 °C water spray over a treatment surface of 9 m², at an output of 35,000 cans per hour. It was configured for 0.33 l and 0.15 l cans.

The tunnel body, frame and pipework are stainless steel. The machine is steam-heated, with a multi-tubular heat exchanger for condensate recovery, and a Siemens PLC with teleservice and a touchscreen HMI runs the process. The machine is currently installed and was seen in operation.

Technical details

  • Year of manufacture: 2023
  • Output: 35,000 cans/h
  • Can sizes: 0.33 l and 0.15 l, diameter 58.4 mm and 53.3 mm
  • Treatment surface: 9 m², single deck, 1 module
  • Treatment time: min. 4.5 minutes
  • Product temperature: 5 °C inlet, 25 °C outlet
  • Spray water temperature: 40 °C
  • Steam consumption: approx. 508 kg/h at 3 bar
  • Make-up water: approx. 1 m³/h
  • Instrument air: approx. 500 Nl/h at 6 bar
  • Installed power: 9 kW
  • Electrical supply: 400 V, 50 Hz
  • Conveyor height: 1,200 mm ± 30 mm
  • Footprint: approx. 6,300 mm long, 2,450 mm wide (3,030 mm including side piping)
  • Height: approx. 1,800 mm
  • Service clearance: 800 mm around the machine
  • Connections: water inlet 15-20 °C max. 2 bar, steam 3 bar, air 1/2" at 6 bar, basin overflow DN 100, basin drain 1 1/2" BSP

Equipment

  • Single-deck tunnel warmer, 9 m², 1 module
  • Multi-tubular heat exchanger for condensate recovery
  • 1.1 kW blower for water recovery
  • Tank with condensate booster pump
  • Air conditioning unit
  • Active infeed and outfeed conveyor
  • Side inspection windows on the spray zone
  • Siemens PLC with teleservice, touchscreen HMI with process overview
  • Profinet port, cycle pause and auxiliary start buttons, emergency stop, main switch, signal tower

Condition and availability

  • Built in 2023, currently installed and in operation
  • Layout drawing available
  • Availability on request
  • Location: Albania

*There may be differences between the data shown and the actual values, this should be confirmed by the sales representative.

If you have any further questions please contact us

Image of the product

Jamie Kenyon

Your Account Manager

CLICK TO CHAT ON WHATSAPP

Related Products